Tamil Nadu Infrastructure Dashboard

Tamil Nadu is developing high-speed industrial expressways linking Chennai, Coimbatore, and Bengaluru alongside Chennai Metro phase expansions.

Key Nodal Authorities:NHAITNHAICMRL

State Macro Infrastructure Specs

Tracked Corridors10
Total Network12,593 km
REGIONAL INFRASTRUCTURE DIRECTORY

Corridors & Mega Projects in Tamil Nadu

Land Acquisition & Tendering73 km

Bengaluru Peripheral Ring Road

A proposed 73.03 km 8-lane greenfield access-controlled bypass (Bangalore Business Corridor) planned by BDA on a 65 m corridor width under DBOT/PPP mode at an estimated cost of approximately ₹27,000 Crore with a 2029 target completion.

View Project Details
Partially Operational / Under Construction280 km

Bengaluru Satellite Town Ring Road (STRR)

An approximately 280 km access-controlled 4/6-lane access-controlled highway bypass connecting key towns and industrial belts around metropolitan Bengaluru across Karnataka and Tamil Nadu.

View Project Details
ProposedUnconfirmed / Proposed alignment distance

Coimbatore Bengaluru Expressway

A proposed approximately 250 km access-controlled highway bypass corridor designed to connect Bengaluru and Coimbatore via Erode, Salem, and Hosur.

View Project Details
Under Construction116 km

Chittoor Thatchur Expressway

An approximately 116.1 km six-lane, access-controlled greenfield corridor designed to enhance connectivity between Keenatampalli in Andhra Pradesh and Thatchur in Tamil Nadu.

View Project Details
Fully Operational10 km

Electronic City Elevated Expressway

An operational 9.98 km elevated tollway corridor connecting Central Silk Board to Electronic City along Hosur Road (NH-44).

View Project Details
Under Construction1,270 km

Surat Chennai Expressway

A massive greenfield and brownfield economic corridor linking Surat in Gujarat to Chennai in Tamil Nadu, passing through Maharashtra, Karnataka, Telangana, and Andhra Pradesh.

View Project Details
DPR Stage306 km

Chennai–Bengaluru High-Speed Rail

A 306 km high-speed rail corridor at 320 km/h connecting Chennai and Bengaluru with a 14.7 km tunnel through Mogili Ghat and a station at Parandur Greenfield Airport.

View Project Details
Proposed / Under Construction9,114 km

High-Speed Rail Network (India)

India's comprehensive high-speed and semi-high-speed rail network linking Delhi, Mumbai, Chennai, and Kolkata under the Diamond Quadrilateral program.

View Project Details
Proposed / DPR Preparation760 km

Chennai–Hyderabad High-Speed Rail Corridor

A proposed ~760.09 km high-speed rail corridor operating at 320 km/h with 18 proposed stations connecting Hyderabad and Chennai via Shamshabad, Future City, Haliya, Vadapalli, Amaravati, Guntur, Ongole, Nellore, and Tirupati.

View Project Details
Active664 km

Hyderabad–Chennai High-Speed Rail Corridor

The Hyderabad–Chennai High-Speed Rail Corridor is an active infrastructure project spanning 664 km. The latest August 2026 update details package progress at 0%, with completion estimated by TBD.

View Project Details
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter